Serving the Greater Cincinnati Area
    Carton Flow Rack system inside a Kentucky warehouse
    Erlanger, Kentucky

    Carton Flow Shelving Systems in Erlanger, KY

    Adding carton flow systems is the fastest way to raise storage capacity in a Erlanger warehouse. Stacking vertically instead of spreading out recovers staging lanes, shortens travel between picks, and cuts the damage that comes with floor-stacked loads.

    The payoff is measurable: more pallet positions per square foot, cleaner put-away, and less double-handling — lane widths set from your case list, not a standard bay. We design the carton flow shelving around your pallets, lift trucks, and clear height, then send a CAD layout with position counts and an itemized quote. Call (513) 957-3017.

    (513) 957-3017

    Why Erlanger Warehouses Work With Us

    Warehouses in and around Commonwealth Avenue tend to be constrained by something specific: a low sprinkler line, tight columns, or a dock that will not take a full truck at once. Those details decide the design.

    We have been laying out carton flow rack for freight forwarding and air cargo support operations in this market as part of Warehouse Equipment & Supplies Co. since 1997, so the constraints are familiar before we ever draw a bay.

    And you deal with one team throughout — layout, pricing, delivery windows, installation scheduling, and parts after the fact. Nothing gets handed off to a call center.

    Free warehouse consultation by phone
    CAD layout with position counts
    Itemized quote before anything ships
    Installation by trusted installation partners
    Parts and service after the install

    Operations We Rack Around Here

    Nearby areas we work in regularly include the Dolwick Drive industrial area, Commonwealth Avenue, the airport freight corridor.

    Freight forwarding
    Air cargo support
    Auto parts distribution
    Contract logistics
    Carton flow rack with gravity wheel beds and case lanes
    Carton flow shelving on a warehouse pick line

    How Carton Flow Rack Works

    Gravity wheel beds that feed cases to the pick face and restock from behind.

    1

    Inclined wheel beds

    Full-width wheel bed or roller track sits on a slight incline inside a standard bay, so cases advance under their own weight.

    2

    Pick from the front

    The picker always reaches the same forward position. Travel drops, and so does the time spent hunting for the next case.

    3

    Restock from the back

    Replenishment loads the high end from a separate aisle, so restocking never blocks the pick line and rotation stays first in, first out.

    4

    Lanes per SKU

    Lane dividers set the width for each case size, giving every SKU a face that can be resized as your mix changes.

    What a Carton Flow Rack Project Includes

    We start by understanding the operation — pallet profile, equipment, clear height, SKU count, and throughput — because those inputs decide capacity long before any steel is quoted.

    From there our design team produces a CAD layout showing positions, elevations, and aisle widths, plus an itemized quote so you can see cost per pallet position. Where it helps, we price a second configuration alongside it, with gravity wheel beds feeding cases to a fixed pick face, so the tradeoff between density and access is a number instead of an opinion.

    Common items ship from stock, and we stage deliveries to match your dock. Our installation partners set and anchor the system to the drawing, verify it loaded, and tag it with capacities. We sequence the work zone by zone so receiving and shipping never stop, and we stay reachable for parts, expansions, and repairs afterward.

    Case and each picking operations
    Order fulfillment with many SKUs on the pick line
    Grocery, beverage, and consumer goods distribution
    Kitting and light assembly feed lines
    Bays where reserve pallets sit above the pick face
    Call (513) 957-3017

    Recent Installations

    Racking projects completed for warehouses across Southwest Ohio and Northern Kentucky.

    Pallet rack installation project 1
    Pallet rack installation project 2
    Pallet rack installation project 3
    Pallet rack installation project 4
    Pallet rack installation project 5
    Pallet rack installation project 6
    Pallet rack installation project 7
    Pallet rack installation project 8
    Pallet rack installation project 9
    Pallet rack installation project 10

    Get a Carton Flow Rack Quote for Your Erlanger Warehouse

    Send the basics and we will follow up with a layout and pricing. Prefer to talk it through? Call (513) 957-3017.

    Cincinnati Pallet Racks

    2345 Ashland Ave.

    Unit #584

    Cincinnati, OH 45206

    (513) 957-3017

    Monday - Friday: 8:00 AM - 6:00 PM

    We respect your privacy. Your information will never be shared.

    Carton Flow Rack Questions We Hear Most

    Other Rack Types We Supply in Erlanger

    Nearby Areas We Also Serve

    Our delivery and installation territory covers Southwest Ohio and Northern Kentucky, so one team can handle multiple buildings for the same company.

    Where We Work

    Located in Cincinnati, we serve the entire Greater Cincinnati area with industrial pallet racks and warehouse storage solutions.

    Cincinnati Pallet Racks

    Address

    2345 Ashland Ave.
    Unit #584
    Cincinnati, OH 45206

    Business Hours

    Monday - Friday: 8:00 AM - 6:00 PM
    Saturday: Closed
    Sunday: Closed

    Need Carton Flow Rack in Erlanger?

    Call (513) 957-3017 or request a quote and we will get a layout started.

    (513) 957-3017
    Call Now